Blog / ESG Bristol Building Solar expanded to 15KW 3 March 2023 — by Barry Bassett VMI’s Bristol building which was fitted with a 10.6KW Solar PV array in 2022, has been expanded to 15KW in March 2023 in order to provide the majority of it’s power requirements, specifically to cope with the introduction of EVs to the Bristol branch.Even with EVs, 15KW is a lot more power than the Bristol branch is likely to use except at peak times and since our surplus is now being sold to the grid, we will in some small way help fortify Britain’s green power generation.